- The chimney and fireplace have been removed.
- The repairs to the north and south walls are complete.
- Sheer walls have been put in place in the north and south ends of the Fellowship Hall.
- Blocking is being added to all of the sanctuary perimeter walls.
- Pending projects include:
- Adding blocking between the top plate and the roof so that a positive connection can be made and the roof can be secured to the top plate.
- Installing the ridge beam inside the sanctuary at the peak of the ceiling.
- Removal of additional siding.
- Install blocking in the sanctuary floor system.
No comments:
Post a Comment